A Prediction Method for TBM Cutterhead Dynamic Tunneling Performance under Typical Composite Geological Conditions
Abstract
Keywords
Full Text:
PDFReferences
Huo J. Z., Wu H. Y., Sun W., Zhang Z.G., Wang L. P., Dong J.H., 2017. Electromechanical coupling dynamics of TBM main drive system. Nonlinear Dynamics, 90, 2687-2710.
Chai B. M., Bai Y. L., Liu J. Q., Li L. L., 2017. Research on multiple damage of remanufacturing TBM cutterhead.
Journal of Hebei University of Engineering (Natural Science Edition), 34, 109-112.
Samuel A.E., Seow L.P., 1984. Disc force measurements on a full-face tunnelling machine. International Journal of Rock Mechanics & Mining Sciences & Geomechanics Abstracts, 21,83-96.
Rostami J., 1997. Development of a force estimation model for rock fragmentation with disc cutters through theoretical modeling and physical measurement of crushed zone pressure. Colorado: Colorado School of Mines. Department of Mining Engineering.
Zhang Z.X., Kou S.Q., Lindqvist P.A., 2003. In-situ measurements of cutter forces on boring machine at Äspö hard rock laboratory part II. characteristics of cutter forces and examination of cracks generated. Rock Mechanics & Rock Engineering, 36, 63-83.
Gertsch R., Gertsch L., Rostami J., 2007. Disc cutting tests in Colorado Red Granite: Implications for TBM performance prediction. International Journal of Rock Mechanics & Mining Sciences, 44, 238-246.
Entacher M., Winter G., Galler R.,2013. Cutter force measurement on tunnel boring machines-Implementation at Koralm tunnel. Tunnelling & Underground Space Technology Incorporating Trenchless Technology Research, 38, 487-496.
Jeong H. Y., Cho J. W., Jeon S., Rostami J., 2015. Performance assessment of hard rock TBM and rock boreability using punch penetration test. Rock Mechanics & Rock Engineering, 49, 1-16.
Yang H., Wang H., Zhou X., 2016. Analysis on the rock-cutter interaction mechanism during the TBM tunneling process. Rock Mechanics & Rock Engineering, 49,1073-1090.
Xiao N., Zhou X. P., Cheng H., Zhai S.F., 2015. Mechanism of rock fragmentation by TBM cutters using 3D FEM-SPH
coupling method. Journal of China Coal Society, 40, 1263-1269.
Liu J. Q., Liu M. M., Guo W., 2015. Research on the simulation of cutting rock rotary by hard rock tunnel boring machine disc cutters. Journal of Mechanical Engineering, 51,199-205.
Geng Q., Wei Z., Ren J.,2017. New rock material definition strategy for FEM simulation of the rock cutting process by TBM disc cutters. Tunnelling & Underground Space Technology, 65,179-186.
Xia Y. M., Guo B., Cong G. Q., Zhang X. H., Zeng G. Y.,2017. Numerical simulation of rock fragmentation induced by a single TBM disc cutter close to a side free surface. International Journal of Rock Mechanics & Mining Sciences, 91, 40-48.
Jiang M., Liao Y., Wang H.,2017. Distinct element method analysis of jointed rock fragmentation induced by TBM cutting. European Journal of Environmental & Civil Engineering, 7,1-20.
Xia Y. M., Tian Y. C., Tan Q., Hou Y. M.,2016. Side force formation mechanism and change law of TBM center cutter. Journal of Central South University, 23,1115-1122.
Geng Q., Wei Z., Meng H., 2016. An experimental research on the rock cutting process of the gage cutters for rock tunnel boring machine (TBM). Tunnelling and Underground Space Technology, 52,182-191.
Zhu X. H.,2014. Research on distribution characteristic of excavation load on TBM cutterhead. Changsha: Central South University.
Liu J., Ren J., Wei G.,2015. Thrust and torque characteristics based on a new cutter-head load model. Chinese Journal of Mechanical Engineering, 28, 801-809.
Liu J. Q., Bin H. C., Guo W.,2019. Study on load characteristics of TBM cutterhead under mixed-face rock ground condition. Journal of Harbin Engineering University, doi:10.11990/jheu.201609049.
Huang T., Wang X. L., Liu H. T., Yang Y. H., 2016. Force analysis of an open TBM gripping-thrusting-regripping mechanism. Mechanism & Machine Theory, 98,101-113.
Han M.D., Cai Z. X., Qu C. Y., Jin L. S.,2017. Dynamic numerical simulation of cutterhead loads in TBM tunneling. Tunnelling & Underground Space Technology, 70, 286-298.
Rostami J.,2008. Hard rock TBM cutterhead modeling for design and performance prediction. Geomechanics & Tunnelling, 1,18-28.
Geng Q., Wei Z. Y., Meng H., Francisco J. M., 2016. Mechanical performance of TBM cutterhead in mixed rock ground conditions. Tunnelling & Underground Space Technology Incorporating Trenchless Technology Research, 57,76-84.
Geng Q., Wei Z. Y., Meng H., Francisco J. M., Amund B.,2016.Free-face-assisted rock breaking method based on the multi-stage tunnel boring machine (TBM) cutterhead. Rock Mechanics & Rock Engineering, 49,4459-4472.
Huo J. Z., Wu H. Y., Yang J., Sun W., Li G. Q., Sun X. L.,2015. Multi-directional coupling dynamic characteristics analysis of TBM cutterhead system based on tunnelling field test. Journal of Mechanical Science and Technology, 29,3043-3058.
Huo J. Z., Hou N., Sun W., Wang L.P., Dong J.H., 2016. Analyses of dynamic characteristics and structure optimization of tunnel boring machine cutter system with multijoint surface. Nonlinear Dynamics, 1,1-18.
Avunduk E., Copur H.,2018. Empirical modeling for predicting excavation performance of EPB TBM based on soil properties. Tunnelling & Underground Space Technology, 71,340-353.
Wang L.H., Kang Y.L., Cai Z.X., Zhao Y., Zhao H.F., Su P.C.,2012. The energy method to predict disc cutter wear extent for hard rock TBMs. Tunnelling & Underground Space Technology Incorporating Trenchless Technology Research, 28,183-191.
Mirahmadi M., Tabaei M., Dehkordi M. S.,2017. Estimation of the specific energy of TBM using the strain energy of rock mass, case study: Amir-Kabir water transferring tunnel of Iran. Geotechnical and Geological Engineering,35,1991-2002.
DOI: https://doi.org/10.33142/me.v1i1.659
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 Jingxiu Ling, Xiaojing Yang, Zhihong Wu
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.