Research on Design Method of Dynamic Shop Floor Scheduling System Based on Human-computer Interaction
Abstract
Keywords
Full Text:
PDFReferences
Fan, C., Wang, W., & Tian. Flexible job shop scheduling with stochastic machine breakdowns by an improved tuna swarm optimization algorithm [J]. Journal of manufacturing systems, 2024 (74):180-197.
Zheng, T., Zhou, Y., Hu, M., & Zhang. Dynamic scheduling for large-scale flexible job shop based on noisy DDQN [J].International Journal of Network Dynamics and Intelligence, 2023 (45):100015-100015.
Cai, J., Lei, D., Wang, J, et al.. A novel shuffled frog-leaping algorithm with reinforcement learning for distributed assembly hybrid flow shop scheduling [J].International Journal of Production Research, 2023,61(4):1233-1251.
Li, L., Deng, L., Tang, B., et al. Bi-objective flexible job shop scheduling on machines considering condition-based maintenance activities [J]. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability, 2024,238(6):1244-1255.
Wu, R., Zheng, J., & Yin, X. Dynamic Scheduling for Multi-Objective Flexible Job Shops with Machine Breakdown by Deep Reinforcement Learning [J]. Processes,2025,13(4):1246.
Nisar, M. U., Ma’ruf, A., & Halim, A. H. In Proceedings of the International Manufacturing Engineering Conference & The Asia Pacific Conference on Manufacturing Systems [C]. Singapore: Springer Nature Singapore,2022.
Luo, W., Huang, K., Liang, X., et al. Process manufacturing intelligence empowered by industrial metaverse: A survey [J]. IEEE Transactions on Cybernetics, 2024(42):89-91.
Subramanian, K., Thomas, L., Sahin, M., et al. Supporting human–robot interaction in manufacturing with augmented reality and effective human–computer interaction: a review and framework [J]. Machines, 2024,12(10):706.
Agostinelli, T., Generosi, A., Ceccacci, S., et al. Validation of computer vision-based ergonomic risk assessment tools for real manufacturing environments [J]. Scientific Reports,2024,14(1):27785.
Tian, S., Wang, T., Zhang, L., et al. The Internet of Things enabled manufacturing enterprise information system design and shop floor dynamic scheduling optimisation [J]. Enterprise Information Systems,2020,14(9-10):1238-1263.
Zambrano-Rey, G. M., González-Neira, et al. Minimizing the expected maximum lateness for a job shop subject to stochastic machine breakdowns [J]. Annals of Operations Research,2024,338(1):801-833.
Azim, N. H., & Subki, A. Abiotic stresses induce total phenolic, total flavonoid and antioxidant properties in Malaysian indigenous microalgae and cyanobacterium [J]. Malaysian Journal of Microbiology, 2018,(11):25-33.
Kouvelis, P., & Yu, G. Robust discrete optimization and its applications [D]: Springer Science & Business Media,2013.
Fan, C., Wang, W., & Tian, J. Flexible job shop scheduling with stochastic machine breakdowns by an improved tuna swarm optimization algorithm [J]. Journal of manufacturing systems,2024,(74):180-197.
DOI: https://doi.org/10.33142/mes.v7i2.18369
Refbacks
- There are currently no refbacks.
Copyright (c) 2026 Songling TIAN, Zhuke CAI, Xiaoqiang WU, Xiaoqian QI

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.